HUGO Projects
65 Wood St Lane Cove West
Toggle Dropdown
Present
Compose email
Compose report
Edit
PC
HW
WC
EC
Set up and teardown ### AREAS: REAR - pool sorrowing - retaining wall - patio floor SIDE - concrete alongside house FRONT - carport floor - spot clean roof tiles. - steps and porch floor
Amount
Update
Set up and teardown ### AREAS: FRONT - wash down SIDE - wash down REAR - spot clean patio area ceiling - top side of patio roof
Amount
Update
### AREAS: All windows and doors (inside and out) NOTE: WE can schedule this to be done after 2 PM so that we do not interfere with the cafes on the ground level
Amount
Update
### AREAS: FRONT Gutter clean carport roof
Amount
Update