Cost estimate: $None
Proposed date: None
Set up and teardown
### AREAS:
FRONT
- Path to entrance and edging
- Garden edging
NORTHERN SIDE
- Brick paver landing
- Path and steps
- Boundary wall and sandstone capping
REAR
- Steps to upper floor
- Panding area on lower level
- Pool sorround
DAY RATE: $600
MAN-DAYS ESTIMATE: 1.5 to 2
Set up and teardown
### AREAS:
SOUTHERN SIDE
### AREAS:
MAIN DWELLING ROOF $400
GARAGE ROOF $50
POOL DECKING $50
NOTE: Algaecide cost is $6 per litre and charged separately. Expected usage: 20L